Project Title: Hughes Hall Pavilion Project University of Cambridge
Location: Wollaston Road | CAMBRIDGE
Due to complete: December 2028
Client: Hughes Hall Limited
Project Manager: Bidwells
Quantity Surveyor: AtkinsRéalis
Architect: Fielden Fowles
Structural Engineer: Structure Workshop
Services Engineer: Skelly & Couch
Project value: £30m
Design and construction of 116 new en-suite bedrooms, improved study and meeting spaces, social areas, and a new Porters’ Lodge.
The project is targeting BREEAM NC 2018 ‘Excellent’. Three separate buildings are included in the development; Mortimer Court (5 storey), Porters Lodge (3 storey) and Wileman Court (2 and 3 storey) which links to the existing Grade II listed Margaret Wileman Building. Site-wide landscaping will connect the new buildings and integrate them into the existing College site.